Some Sals trailwork

I had an idea for some light trailwork/trail maintenance . We can widen that first switchback turn on the Spanky/red trail. This has always been too tight. It was the first switchback we ever constructed at Sals and it takes a little bit of messing around til you know what you're doing.This isn't hard work-you would cut into the uphill side which is all loose soil and rocks. This matter would get carried right to the downhill side/crib wall platfrom.

While we're at it we can improve the turn that leads to the switchback. This is the right hand climbing turn on the Spanky. We could make it much wider and more interesting.

Anyhow this stuff could be done in a few hours and its right by the road so easy access.