Hi all, just seeing if there is any interest in doing some trail work at Jordan come early mid April. The main project I am planing is a trail reroute at the end of the creek trail where the storm drain dumps all the water across and down the trail. The idea here would be swing the trail out to the right, go over the wash out with a bridge(thats allready laying there) and then bend the trail back to the origanal trail down a ways. I all have a great line planed out, just need to get it done. Let me know what you all think.